Description
This class covers the implementation of an integrated BIM system inside the Design and Construction Joint Venture (VCGP + ASTALDI) of the Santiago de Chile Airport. On this project, BIM data life cycle starts with model authoring creation using Autodesk Revit and Civil 3D for 354.000 m2 on buildings and 880.000 m2 on infrastructures. Design Review and Constructability Analysis are performed with the support of Autodesk Revit, Civil 3D, Recap, Infraworks, Navisworks and Tekla Structure. Throughout the project, BIM collaboration and coordination are ensured with Autodesk Navisworks. Connection of BIM models with construction planning (Primavera) is done via Synchro software for 4D simulation. At the end of the project, As Built BIM models (LOD 500) are handed over for O&M software (IBM Maximo) link purposes. A particular attention will be brought to the challenges of implementing such process on a large scale project as well as best practices for BIM deliverables to final clients.
Key Learnings
- Identify the challenges of deploying BIM on a large scale construction project
- Best practice to educate and involve project stakeholders into BIM process
- Interface between As Built Model and O&M
- BIM deliverables best practice
Downloads
Tags
Product | |
Industries | |
Topics |